Reference ID: AER-149-68526
Period Finish: Sep/2024
Status: Submitted
Project: J05392 Paterson / Greatland Gold
-> Environmental Group Site (Site):
S0239149 Havieron Evironmental Group


Are you sure you want to lock this MRF Submission?

Are you sure you want to unlock this MRF Submission?

Step 1 Report Details
Company / Individual Details

NEWCREST MINING LIMITED
Site Details

J05392

Paterson / Greatland Gold

S0239149

Havieron Evironmental Group
Report Period

Oct/2023

Sep/2024
Step 3.1 Environmental Group Site - Site Activity Summary
Guidance

Provide a summary of the following for the AER reporting period:

  • The status of the site
  • exploration activities
  • operational mining activities
  • rehabilitation activities
  • progress towards mine closure (e.g. research / trials undertaken, progress with closure plan)
  • progress against the care and maintenance plan (if applicable*)

Attach supporting information in the Attach Documents section.

*   Sites on care and maintenance require a care and maintenance plan. For more information, refer to section 88 of the Mine Safety and Inspection Act 1994 and the worksheet
http://www.dmp.wa.gov.au/Documents/Environment/ENV-MEB-221.pdf
.

Site Activity Summary

Site status:

The Havieron Underground Mine Project (Havieron Project) is a greenfield gold-copper deposit located approximately 45 km east of the Telfer, originally commenced in 2020 as a joint venture between Newcrest Operations Ltd and Greatland Pty Ltd.

 

In November 2023, Newmont purchased Newcrest Mining Ltd and in so doing acquired Newcrest Operations. Newmont holds a 70% interest in the Havieron JV arrangement with 30% held by Greatland. Greatland announced on 10 September 2024 that it had entered into a binding agreement with Newmont to acquire, subject to certain conditions being satisfied, Newmont’s 70% ownership interest in the Havieron gold-copper project, 100% ownership of the Telfer gold-copper mine, and other related assets in the Paterson region.

 

The development of the Havieron Project to date has involved exploration and early works (Stage 1) activities. Stage 1 commenced in December 2020 with more exploration work completed during the 2022 and 2023 reporting periods. A description of mining activities for this reporting period (1 October 2023-30 September 2024) includes:

 

Tenement L 45/582 and L 45/636

  • Roadworks to widen the Northern Access Road to a two-way road.

Tenement M 45/1287

  • Continued development of single heading decline until November 2023 where development was paused due to a revaluation of capital expenditure by Newmont Australia. Development has been paused for the remainder of the reporting period.
  • Commissioning of two sediment ponds adjacent to Evaporation Pond 1 with 6-inch pump lines leading to two silt busters.
  • Temporary turkey’s nest decommissioned and demolished.
  • Temporary V-drain installed on eastern side of Evaporation Pond 1 to allow for better storm water management. This is a temporary fixture until a more permanent solution is provided by Worley consulting based on water modelling

Exploration:

Exploration activities at the Havieron Project are managed in accordance with the Department of Energy, Industry Regulation and Safety (DEMIRS) Programme of Works (PoW) conditions and established Environmental Management Plans (EMPs) and procedures applicable to the Havieron Project. The Newmont Exploration EMP is in place to manage specific processes and environmental impacts from exploration activities.

No new exploration activities have occurred during this reporting period.

 

Mining Activities:

Work conducted during the reporting period included the following:

  • Continuation of a single heading decline, this was put on hold in November 2023 due to approval restrictions and the sale of the mine.
  • Commissioning of two sediment ponds adjacent to Evaporation Pond 1 with 6-inch pump lines leading to two silt busters
  • Temporary V-drain inserted on eastern side of evaporation pond 1 to allow for better storm water managament

 

Rehabilitation

A progressive rehabilitation strategy has been implemented for exploration activities. However, no project or exploration rehabilitation took place during this reporting period. No rehabilitation trials have progressed during the reporting period as landforms at the rehabilitation stage were not available. The next opportunity to undertake rehabilitation trials will require the completion of Stage 1 mining.

 

Progress towards Mine Closure

The stage 1 Mine Closure Plan has been approved for the Project. A revised Mining Proposal for Stage 1 (Rev 4) has also been approved and it includes closure plans for this stage. An outline of the MCP inclusion and objectives has been submitted to the EPA as part of the referral for Stage 2 and may be subject to public comments during the advertising period.

 

Summary of future works over the next 12 months

During the next reporting period (2024/2025), Newmont / Greatland will continue with exploration and mining activities as follows: Tenement M 45/1287

• Construction and operation of additional Evaporation Ponds 4 – 6. Work is scheduled for February 2025 commencement conditional upon Primary and Secondary Approvals under the EP Act (1986), the EPBC Act (1999), the Mining Act (1978) and the Rights in Water and Irrigation Act (1914). A nominal 3-month construction phase is proposed. The construction also includes:

  • Pipeline and associated infrastructure
  • Additional monitoring bore installation 
  • Additional clearing and construction for topsoil management

• Recommencement of aquifer depressurisation and mine development to 420mRL (completion of works under Mining Proposal Stage 1 Reg ID 121684). Recommencement dependent upon completion and commissioning of Ponds 4 – 6, nominally June 2025

• Additional monitoring bore installation

• Commence capping on WRL 1. At the completion of Stage 1 mining, pending approvals, the Havieron project will move to Stage 2 which may include the following within the next 12 months:

Tenement L45/636

• Development of Infrastructure corridor between Telfer and Havieron consolidating the existing access road with power and water infrastructure.


Attached Documents

There are no attachments to display

Step 3.2 Environmental Group Site - Site Summary Table
Guidance

Provide a concise overview of the operations and the progress of closure planning for the Environmental Group Site.

Site Status

Active

GOLD

2020

5

13
1
42.1220
1
240.2507


1 Value calculated from the information supplied in Step 3.4 Area of Activity.
Materials Balance
Total (m3 or tonnes) Comments
Volume of Material Mined: 22,419 m3 1 October 2023 - 30 September 2024
Plant Throughput: 0 m3
Volume of Waste Rock: 93,688 m3 only waste
Volume of Topsoil: 157,359 m3
Volume of Other Growth Medium2: 0 m3
Volume of Suitable Capping Material: 0 m3


2 An alternative "growth medium" may be required where topsoil is either not naturally present in adequate volumes to address rehabilitation requirements, or was not preserved (e.g. stripped and stockpiled) prior to mining.
Bond

$0.00
Total bond amount calculated from tenements listed in Step 2. Review Tenements
Closure Plan

Operational

Yes


19/02/2024


Yes


18/03/2024


Step 3.3 Environmental Group Site - Site Plan
Guidance

A Site Plan must be attached that clearly and accurately reflects the information provided in this AER. The minimum requirements for the Site Plan are:

  • All operations and areas disturbed should be drawn on the plan with the scale and legend clearly shown
  • All tenements and their boundaries indicated
  • Include topographical, mine-site infrastructure details and cadastral information
  • Include areas rehabilitated to date with year completed and rehabilitation stage
  • Show areas disturbed during the reporting period
  • Show areas proposed for disturbance during the following reporting period

The Site plan will be publically available via the department's website. Please attach both a public and full version of the site plan if your main document contains confidential information.

Attached Site Plans
Authorised for Public Release File Name File Size Description
Yes TE23006 Newcrest Havieron DMIRS_AER_2024_2.0 Appendix A.pdf 3 MB AER summary site plan
Step 3.4 Environmental Group Site - Area of Activity
Guidance

All mining related disturbance and rehabilitation activity present at the end of the AER reporting period needs to be reported.

Enter a summary of how the area data was verified (e.g. orthophotography, surveying), click the Save Form button, then review and update the activities, disturbance and rehabilitation data for each tenement.

Data Verification Method

In the 2023/2024 reporting period, the disturbance data was digitised from aerial imagery and reported as part of the Mining Rehabilitation Fund (MRF). The activity data was verified with 10 centimetres (cm) resolution RGB (red-green-blue) and NIR (Near-Infrared) imagery as well as 10 cm Digital Terrain Model (DTM), Digital Surface Model (DSM) (if required) and 0.5 m contours. Forming part of the continual improvement cycle, the disturbance data is reviewed on a regular basis to increase precision and accuracy. As part of the review process, there may be some instances of variation within the reported disturbance.

 

*Tenements L45/582 has been divided into two tenements across L45/582 and L45/636 since the Mining Proposal Rev 3

Tenement Activity Summary
Tenement Assessment Date Area Approved (ha) Total Area of Activity (ha) Land Under Rehabilitation (ha) Relinquished (ha) Disturbance (ha)
Reporting Period Change Stage 1 Stage 2 Total Rehab
L 45/582 31/10/2024 0.9720 16.3770 -12.0330 0.0000 0.0000 0.0000 0.0000 16.3770
L 45/636 31/10/2024 21.9810 43.6210 43.6210 2.5180 0.0000 2.5180 0.0000 41.1030
M 45/1287 31/10/2024 19.1690 183.7067 102.2010 0.9360 0.0000 0.9360 0.0000 182.7707
Total 42.1220 243.7047 133.7890 3.4540 0.0000 3.4540 0.0000 240.2507

Detailed Assessment Information

Tenement: L 45/582 (5 Activities)
Mine Activity Type Mine Activity Reference Area Approved Total Area of Activity (ha) Land Under Rehabilitation (ha) Relinquished Disturbance (ha)
Area as of Previous reporting period Area as of Current reporting period Change Stage 1 Stage 2 Total
Transport or service infrastructure corridor Access Road 28.4100 15.4030 -13.0070 0.0000 0.0000 0.0000 0.0000 15.4030
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Exploration Operations 0.0000 0.0420 0.0420 0.0000 0.0000 0.0000 0.0000 0.0420
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Roadside Cleared Land 0.0000 0.6720 0.6720 0.0000 0.0000 0.0000 0.0000 0.6720
Topsoil stockpile Roadside Stockpile 0.0000 0.2600 0.2600 0.0000 0.0000 0.0000 0.0000 0.2600
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Cleared land 0.9720 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9720 28.4100 16.3770 -12.0330 0.0000 0.0000 0.0000 0.0000 16.3770
There is no assessment information to report on this tenement.
Tenement: L 45/636 (9 Activities)
Mine Activity Type Mine Activity Reference Area Approved Total Area of Activity (ha) Land Under Rehabilitation (ha) Relinquished Disturbance (ha)
Area as of Previous reporting period Area as of Current reporting period Change Stage 1 Stage 2 Total
Transport or service infrastructure corridor Access Road 0.0000 38.2180 38.2180 0.0000 0.0000 0.0000 0.0000 38.2180
Borefield Borefield 0.0840 0.0000 0.0840 0.0840 0.0000 0.0000 0.0000 0.0000 0.0840
Borrow pit or shallow surface excavation (with a depth of less than 5 metres) Borrow Pit 2.5180 0.0000 2.5180 2.5180 2.5180 0.0000 2.5180 0.0000 0.0000
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Cleared Land along Haul road 0.0000 0.4030 0.4030 0.0000 0.0000 0.0000 0.0000 0.4030
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Exploration Operations 0.0000 0.8800 0.8800 0.0000 0.0000 0.0000 0.0000 0.8800
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Pad 0.0000 0.1770 0.1770 0.0000 0.0000 0.0000 0.0000 0.1770
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Roadside Cleared Land 0.0000 0.4020 0.4020 0.0000 0.0000 0.0000 0.0000 0.4020
Topsoil stockpile Roadside Stockpile 0.0000 0.9390 0.9390 0.0000 0.0000 0.0000 0.0000 0.9390
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Other Cleared Land 19.3790 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 21.9810 0.0000 43.6210 43.6210 2.5180 0.0000 2.5180 0.0000 41.1030
There is no assessment information to report on this tenement.
Tenement: M 45/1287 (62 Activities)
Mine Activity Type Mine Activity Reference Area Approved Total Area of Activity (ha) Land Under Rehabilitation (ha) Relinquished Disturbance (ha)
Area as of Previous reporting period Area as of Current reporting period Change Stage 1 Stage 2 Total
Waste dump or overburden stockpile (class 1) Waste Rock Landform 4.2600 4.6470 0.3870 0.0000 0.0000 0.0000 0.0000 4.6470
Plant site Waste Water Treatment Plant 0.1100 0.1150 0.0050 0.0000 0.0000 0.0000 0.0000 0.1150
Sewage pond Irrigation Area 2.1500 2.1560 0.0060 0.0000 0.0000 0.0000 0.0000 2.1560
Building (other than workshop) or camp site Building (other than workshop) or camp site 0.1300 0.1390 0.0090 0.0000 0.0000 0.0000 0.0000 0.1390
Building (other than workshop) or camp site Camp 2.7200 1.1100 -1.6100 0.0000 0.0000 0.0000 0.0000 1.1100
Building (other than workshop) or camp site Core Shed 0.0900 0.0870 -0.0030 0.0000 0.0000 0.0000 0.0000 0.0870
Building (other than workshop) or camp site Explosives Magazine 0.7300 0.7300 0.0000 0.0000 0.0000 0.0000 0.0000 0.7300
Transport or service infrastructure corridor Access Road 18.2900 19.0570 0.7670 0.0000 0.0000 0.0000 0.0000 19.0570
Mining void (with a depth of at least 5 metres) - above ground water level Boxcut 0.9900 2.4900 1.5000 0.0000 0.0000 0.0000 0.0000 2.4900
Laydown or hardstand area Core Processing 1.0400 1.3640 0.3240 0.0000 0.0000 0.0000 0.0000 1.3640
Laydown or hardstand area Mobile and Fixed Campsites 1.5700 1.5600 -0.0100 0.0000 0.0000 0.0000 0.0000 1.5600
Core yard Core Yard 0.8800 1.0610 0.1810 0.0000 0.0000 0.0000 0.0000 1.0610
Borrow pit or shallow surface excavation (with a depth of less than 5 metres) Borrow Pit 5.2857 4.4030 -0.8827 0.0000 0.0000 0.0000 0.0000 4.4030
Topsoil stockpile Topsoil Stockpile 6.7400 6.4860 -0.2540 0.0000 0.0000 0.0000 0.0000 6.4860
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Drill Track 10.4800 11.4710 0.9910 0.0000 0.0000 0.0000 0.0000 11.4710
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Havieron Camp Access Track 0.2900 0.2320 -0.0580 0.0000 0.0000 0.0000 0.0000 0.2320
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Pad 25.7500 12.3910 -13.3590 0.0000 0.0000 0.0000 0.0000 12.3910
Transport or service infrastructure corridor Mine Access Track 0.0000 1.7370 1.7370 0.0000 0.0000 0.0000 0.0000 1.7370
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Additional Area for mine development 0.0000 5.5300 5.5300 0.0000 0.0000 0.0000 0.0000 5.5300
Mining void (with a depth of at least 5 metres) - above ground water level ASD 0.0000 0.0670 0.0670 0.0000 0.0000 0.0000 0.0000 0.0670
Topsoil stockpile Borrow Material 5.2890 0.0000 5.2890 5.2890 0.0000 0.0000 0.0000 0.0000 5.2890
Laydown or hardstand area Camp Laydown Area 0.0000 1.6140 1.6140 0.0000 0.0000 0.0000 0.0000 1.6140
Laydown or hardstand area Camp Services Upgrade 0.0000 1.0340 1.0340 0.0000 0.0000 0.0000 0.0000 1.0340
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Camp South Monitoring Bores 0.0000 0.2080 0.2080 0.0000 0.0000 0.0000 0.0000 0.2080
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Cleared Awaiting ASD 0.0000 1.0950 1.0950 0.0000 0.0000 0.0000 0.0000 1.0950
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Cleared Awaiting Landfill 0.0000 5.2860 5.2860 0.0000 0.0000 0.0000 0.0000 5.2860
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Cleared Awaiting MIA Sedimentation Area 0.0000 0.6620 0.6620 0.0000 0.0000 0.0000 0.0000 0.6620
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Cleared Awaiting Western Boxcut Extension 0.0000 1.6970 1.6970 0.0000 0.0000 0.0000 0.0000 1.6970
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Cleared Land Awaiting Development 0.0000 17.2150 17.2150 0.0000 0.0000 0.0000 0.0000 17.2150
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Core Shed Communication/Microwave Tower 0.0000 0.0410 0.0410 0.0000 0.0000 0.0000 0.0000 0.0410
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Drill Pad 0.0000 1.2050 1.2050 0.0000 0.0000 0.0000 0.0000 1.2050
Transport or service infrastructure corridor Evaporation Dewatering Pipeline 0.0000 0.4310 0.4310 0.0000 0.0000 0.0000 0.0000 0.4310
Evaporation pond not associated with minerals-in-brine extraction Evaporation Pond 1 0.0000 6.3590 6.3590 0.0000 0.0000 0.0000 0.0000 6.3590
Evaporation pond not associated with minerals-in-brine extraction Evaporation Pond 2 0.0000 4.3350 4.3350 0.0000 0.0000 0.0000 0.0000 4.3350
Evaporation pond not associated with minerals-in-brine extraction Evaporation Pond 3 12.3940 0.0000 12.3940 12.3940 0.0000 0.0000 0.0000 0.0000 12.3940
Transport or service infrastructure corridor Evaporation Pond transport corridor 0.0000 3.5220 3.5220 0.0000 0.0000 0.0000 0.0000 3.5220
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Exhaust Shaft 0.0000 0.1260 0.1260 0.0000 0.0000 0.0000 0.0000 0.1260
Laydown or hardstand area Expansion of Laydown Area 0.0000 0.7590 0.7590 0.0000 0.0000 0.0000 0.0000 0.7590
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Exploration Drill Track 0.0000 0.0180 0.0180 0.0000 0.0000 0.0000 0.0000 0.0180
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Exploration Operations Track 0.0000 12.4250 12.4250 0.0000 0.0000 0.0000 0.0000 12.4250
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Exploration Pad 0.0000 0.1250 0.1250 0.0000 0.0000 0.0000 0.0000 0.1250
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Extension of Existing Drill Pad 0.0000 0.3920 0.3920 0.0000 0.0000 0.0000 0.0000 0.3920
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Extension of Existing Drill Track 0.0000 0.2010 0.2010 0.0000 0.0000 0.0000 0.0000 0.2010
Laydown or hardstand area Geobagging Area 0.0000 2.8370 2.8370 0.0000 0.0000 0.0000 0.0000 2.8370
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations HAHY028 Exploration Disturbance 0.0000 0.0900 0.0900 0.0000 0.0000 0.0000 0.0000 0.0900
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Historic Evaporation Pond 0.0000 1.1790 1.1790 0.0000 0.0000 0.0000 0.0000 1.1790
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Intake Shaft 0.0000 0.1050 0.1050 0.0000 0.0000 0.0000 0.0000 0.1050
Laydown or hardstand area Laydown or Hardstand Area 0.0000 11.7490 11.7490 0.0000 0.0000 0.0000 0.0000 11.7490
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Other Cleared Land 0.0000 1.9180 1.9180 0.0000 0.0000 0.0000 0.0000 1.9180
Plant site Plant Site 0.0000 0.3040 0.3040 0.0000 0.0000 0.0000 0.0000 0.3040
Plant site Power Station 0.0000 0.6097 0.6097 0.0000 0.0000 0.0000 0.0000 0.6097
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Pre-Existing Track 0.0000 3.8040 3.8040 0.0000 0.0000 0.0000 0.0000 3.8040
Other Cleared Land - Land that is cleared of vegetation and is not otherwise described in this Table Road Clearing 0.0000 0.2520 0.2520 0.0000 0.0000 0.0000 0.0000 0.2520
Diversion channel or drain Road/WRD Diversion Sedimentation 0.0000 1.9580 1.9580 0.0000 0.0000 0.0000 0.0000 1.9580
Dam - saline water or process liquor SIlt / RAW Water Dam 0.0000 0.9580 0.9580 0.0000 0.0000 0.0000 0.0000 0.9580
Evaporation pond not associated with minerals-in-brine extraction Silt Trap 0.0000 0.0220 0.0220 0.0000 0.0000 0.0000 0.0000 0.0220
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Studies Bores 0.0000 0.1530 0.1530 0.0000 0.0000 0.0000 0.0000 0.1530
Topsoil stockpile Temporary Topsoil Stockpile 0.0000 2.5290 2.5290 0.0000 0.0000 0.0000 0.0000 2.5290
Dam - saline water or process liquor Turkey Nest 0.5500 0.0000 0.5500 0.5500 0.0000 0.0000 0.0000 0.0000 0.5500
Dam - saline water or process liquor Turkey overflow ponds 0.0000 0.0590 0.0590 0.0000 0.0000 0.0000 0.0000 0.0590
Exploration/Prospecting Operations - Land that has been disturbed by exploration operations Vent Rise Bore 0.0000 0.4280 0.4280 0.0000 0.0000 0.0000 0.0000 0.4280
Laydown or hardstand area Other Cleared Land that is under rehabilitation 0.9360 0.0000 0.9360 0.9360 0.9360 0.0000 0.9360 0.0000 0.0000
Total 19.1690 81.5057 183.7067 102.2010 0.9360 0.0000 0.9360 0.0000 182.7707